Project: “Integrated Project for the Waters of Plovdiv – Stage 1″

Beneficiary: Municipality of Plovdiv

Financing program/institution: Financing program/institution: Operational Program “Environment” 2014-2020, Priority Axis № BG16M1OP002-1.006 “Implementation of the early water supply projects.”

Total value of the project: 115 334 116,42 BGN.

Aims and Expected Results: With the implementation of the project will ensure optimal removal and treatment of wastewater collected in sewer networks that are currently discharged without appropriate enough purification that meets the goals set by Directive 91/271 / EEC requirements. In the present project proposal includes the following measures concerning sewer, replacement of 13.428 km secondary sewerage network in order to reduce the infiltration flow to the wastewater treatment plant (WWTP); Rehabilitation of Main collector VII and construction of a new collector length 2.746 km to ensure sufficient hydraulic capacity of the system. The approved project for reconstruction, modernization and completion of the WWTP – Plovdiv will reduce the flow of pollutants and boigenni elements in the receiving water. Wastewater treatment will enable reliable and stable technology to achieve compliance with European standards for water discharged waste water treatment plants in economically favorable terms. With the implementation of the project will be optimized process for sludge treatment, including sludge stabilization, mechanical removal of water and heat drying sludge and use of biogas.

Duration: 04.04.2018г. – 30.06.2024